Call Us

+1 208-495-0555

Address

16141 N. 20th St. Nampa, ID

Install Post Press ...
 
Notifications
Clear all

[Closed] Install Post Press Conveyors

1 Posts
1 Users
0 Likes
102 Views
Michael Vernor
(@mvernor)
Noble Member Admin
Joined: 2 years ago
Posts: 42
Topic starter  
  • Run a chalk line off a datum from the press to give an approximate location for the post press conveyor feet. Set all the conveyor sections on this line. Do NOT use this line as a final set point for the conveyors.
  • Attach each conveyor section to the prior and subsequent sections using the tie plates and M10x35mm HHCS, washers and Nylocks. Do not fully tighten until final alignment.


  • Use the string line method, outlined in section X.X to align the conveyor sections to the press conveyor.